Food Producer
EVALUATION:
Salt Creek Technologies and FRC Systems worked with facility personnel to identify the scope of upgrade as well as the options to keep the plant operating during construction. .
THE PROBLEM:
A food manufacturer outside of Chicago had an aging wastewater pre-treatment system that was becoming a major maintenance and operational challenge for the facility.
Salt Creek Technologies and FRC Systems worked with facility personnel to identify the scope of upgrade as well as the options to keep the plant operating during construction. .
THE PROBLEM:
A food manufacturer outside of Chicago had an aging wastewater pre-treatment system that was becoming a major maintenance and operational challenge for the facility.
THE SOLUTION:
The team decided a replacement of the pre treatment system was the best path forward. A smaller but fully capable rental system was brought in during the construction of the upgrade to allow the plant to continue operation without interruption.
The team decided a replacement of the pre treatment system was the best path forward. A smaller but fully capable rental system was brought in during the construction of the upgrade to allow the plant to continue operation without interruption.
THE PROCESS:
The new system included two equalization tanks, a screen, chemical conditioning equipment, dissolved air flotation and sludge storage.
The new system included two equalization tanks, a screen, chemical conditioning equipment, dissolved air flotation and sludge storage.